Refresh

This website cityvision.org.nz/events/grafton-gully-cycleway-stage-one-opening/ is currently offline. Cloudflare's Always Online™ shows a snapshot of this web page from the Internet Archive's Wayback Machine. To check for the live version, click Refresh.

Jane Admore, CAA and Christopher Dempsey

Jane Admore, CAA and Christopher Dempsey

Stage one of the Grafton Gully cycleway was opened this morning by NZTA.

It’s only 300m long, but I attended the opening of what will become part of the 1.9k Grafton Gully Cycleway (funded and built by NZTA). I was running late so rode up the cycleway (being first to do so!) and then rode back down with a great bunch of cyclists including Richard Barter and Pippa Coom.

Stage two on Churchill street is currently under construction. Stage three should start in October providing a continuous connection from Beach Road to Upper Queen Street and the NW Cycleway.

Christopher Dempsey, City Vision member on the Waitemata Local Board